Outdoor Furniture

Bar Furniture Bar Table Set Rattan Outdoor Bar Stool

Foshan Shunde Ciao Furniture Co., Ltd.
  • Material:Rattan
  • Frame Material:Aluminum
  • Kind:Fixed Bar Stool
  • Style:Modern
  • Armrest:Without Armrest
  • Folded:Folded

Base Info

  • Model NO.:CF976T+CF976C
  • Color:Optional
  • Usage:Bar, Cafe, Restaurant
  • Customized:Customized
  • Condition:New
  • Warranty:2-5 Years
  • Advantage:Water Resistant and UV Resistant
  • Transport Package:with Craft Paper, Carton for Bar Table and Chair
  • Specification:SGS,BV test for bar table and chair
  • Trademark:Ciao
  • Origin:Foshan, China
  • HS Code:9014
  • Production Capacity:5000 PCS,Month for Bar Table and Chair

Description

ProductBar Furniture Bar Table Set Rattan Outdoor Bar StoolPackagestandard carton / kraft paper +foam packBrandCiao FurnitureDelivery Time25 -45daysFrame MaterialAluminumPayment Term30% deposit by T/t, balance before shipmentFabric ColorBlack / White / Brown / Beige / CustomizedOEM & ODMwelcomeFrame size1.2-2.0mmWarranty2 - 5 years



Wicker Sample                                                                                                                    Fabric Sample

USD 3 Million to USD 5 Million
Bar Furniture Bar Table Set Rattan Outdoor Bar Stool
Showroom
Bar Furniture Bar Table Set Rattan Outdoor Bar Stool
Exhibtion
Bar Furniture Bar Table Set Rattan Outdoor Bar Stool

FAQ

1. What is your MOQ?
MOQ is 1*20 GP container
1*20GP container with no more than 3 items
1*40HQ container with no more than 5 items.

2. Do you aceept sample order?
We accept sample order.However customer has to pay for the product cost and shipping cost.

3. Can I customize outdoor furniture from you?
Yes, can change the Dimension according to your needs.

4. Do you have own factory?
Yes, we are manufacturer with own factory and moulds and production lines, engaged in outdoor furniture for more than 11 years.

5. How about your Lead time?
Our production process needs 15-35 days depend on the product's design and when will you place the order.

6. What about the payment term?
a.More than USD1700, 30%deposit T/T paid before production,the balance paid paid before delivery
b.Less than USD1700,100% deposit paid before production.