Outdoor Furniture

Outdoor Furniture Modern Metal Steel Round Coffee Side Table for Patio

Foshan Shunde Ciao Furniture Co., Ltd.
  • Style:European
  • Usage:Cafe, Outdoor

Base Info

  • Model NO.:CF2788T
  • Kind:Tea Table
  • Folded:Unfolded
  • Color:Option
  • Customized:Customized
  • Condition:New
  • Application:Outdoor , Balcony , Courtyard , Garden , Resort
  • Warranty:2 - 5 Years
  • OEM & ODM:Welcome
  • Logo:Customized
  • MOQ:10PCS
  • Delivery Time:20-45 Days
  • Table Top:Aluminum
  • Top Thickness:10mm
  • Table Shape:Square
  • Table Weight:5kg
  • Transport Package:Kraft Paper
  • Specification:50*50*50
  • Trademark:Ciao furniture
  • Origin:China
  • HS Code:94017190
  • Production Capacity:2000PCS,Months

Description

Product NameLeisure Garden Patio Aluminum Rattan Small Side Table Outdoor FurniturePackagestandard carton / kraft paper +foam packBrandCiao FurnitureDelivery Time25 -45daysFrame MaterialAluminumPayment Term30% deposit by T/t, balance before shipmentFabric ColorBlack / White / Brown / Beige / CustomizedOEM & ODMwelcomeFrame size1.2-2.0mmWarranty2 - 5 years 

Outdoor Furniture Modern Metal Steel Round Coffee Side Table for PatioOutdoor Furniture Modern Metal Steel Round Coffee Side Table for Patio


Wicker Sample Fabric Sample

USD 3 Million to USD 5 Million
Outdoor Furniture Modern Metal Steel Round Coffee Side Table for Patio
Showroom
Outdoor Furniture Modern Metal Steel Round Coffee Side Table for Patio
Exhibtion
Outdoor Furniture Modern Metal Steel Round Coffee Side Table for Patio

FAQ

1. What is your MOQ?
MOQ is 1*20 GP container
1*20GP container with no more than 3 items
1*40HQ container with no more than 5 items.

2. Do you aceept sample order?
We accept sample order.However customer has to pay for the product cost and shipping cost.

3. Can I customize outdoor furniture from you?
Yes, can change the Dimension according to your needs.

4. Do you have own factory?
Yes, we are manufacturer with own factory and moulds and production lines, engaged in outdoor furniture for more than 11 years.

5. How about your Lead time?
Our production process needs 15-35 days depend on the product's design and when will you place the order.

6. What about the payment term?
a.More than USD1700, 30%deposit T/T paid before production,the balance paid paid before delivery
b.Less than USD1700,100% deposit paid before production.