Outdoor Furniture

2016 Modern Outdoor Furniture Wicker Sofa

Foshan Shunde Ciao Furniture Co., Ltd.
  • Material:Aluminum + PE Rattan + Fabric
  • Frame Material:Metal
  • Style:Modern
  • Type:Combination
  • Usage:Bar, Cafe, Restaurant, Indoor & Outdoor
  • Folded:Unfolded

Base Info

  • Model NO.:CF631 Wicker Sofa
  • Color:Option
  • Customized:Customized
  • Condition:New
  • Tube Surface:Powder Coat
  • Frame Thickness:1.2mm
  • Rattan Color:Option
  • Fabric Color:Option
  • Appearance:Elegant and Simple
  • Rattan Warranty:2-5years
  • Fabric:Water Resistent
  • Foam:High Density
  • Transport Package:Kraft Paper with Film or Carton for Wicker Sofa
  • Specification:SGS, BV For Wicker Sofa
  • Trademark:Ciao
  • Origin:Foshan, Guangdong for Wicker Sofa
  • HS Code:9401
  • Production Capacity:2000PC,Month for Wicker Sofa

Description

Production NamePatio Garden Powder Coating Rope Weaving Outdoor Furniture SofaPackagestandard carton / kraft paper +foam packBrandCiao FurnitureDelivery Time25 -45daysFrame MaterialAluminumPayment Term30% deposit by T/t, balance before shipmentFabric ColorBlack / White / Brown / Beige / CustomizedOEM & ODMwelcomeFrame size1.2-2.0mmWarranty2 - 5 years
2016 Modern Outdoor Furniture Wicker Sofa2016 Modern Outdoor Furniture Wicker Sofa

Wicker Sample Fabric Sample

USD 3 Million to USD 5 Million
2016 Modern Outdoor Furniture Wicker Sofa
Showroom
2016 Modern Outdoor Furniture Wicker Sofa
Exhibtion
2016 Modern Outdoor Furniture Wicker Sofa

FAQ

1. What is your MOQ?
MOQ is 1*20 GP container
1*20GP container with no more than 3 items
1*40HQ container with no more than 5 items.

2. Do you aceept sample order?
We accept sample order.However customer has to pay for the product cost and shipping cost.

3. Can I customize outdoor furniture from you?
Yes, can change the Dimension according to your needs.

4. Do you have own factory?
Yes, we are manufacturer with own factory and moulds and production lines, engaged in outdoor furniture for more than 11 years.

5. How about your Lead time?
Our production process needs 15-35 days depend on the product's design and when will you place the order.

6. What about the payment term?
a.More than USD1700, 30%deposit T/T paid before production,the balance paid paid before delivery
b.Less than USD1700,100% deposit paid before production.